logo
products
NEWS DETAILS
Home > News >
Business Tour Report: Supplier Visits Across China with Malaysian Clients
Events
Contact Us
86--13415389151
Contact Now

Business Tour Report: Supplier Visits Across China with Malaysian Clients

2025-07-21
Latest company news about Business Tour Report: Supplier Visits Across China with Malaysian Clients

Business Tour Report: Supplier Visits Across China with Malaysian Clients

Host: Mr. Tang, International Business Director
Clients: 5-member delegation from Malaysia (Transformer Manufacturers)
Duration: 12-day program (March 5-16, 2024)

Itinerary & Technical Focus:

  1. Chunming, Hubei (3 days)

  • Evaluated epoxy resin raw material suppliers

  • Conducted viscosity/purity tests at 3 factories

  • Negotiated 15% bulk purchase discount

  1. Shanghai (2 days)

  • Visited transformer casing manufacturers

  • Compared 5 automated production lines

  • Agreed on new anti-corrosion coating standards

  1. Zhejiang (4 days)

  • Audited insulation component suppliers

  • Witnessed live UL certification testing

  • Selected 2 qualified vendors

  1. Guangdong (3 days)

  • Inspected final assembly facilities

  • Tested 10 sample units under load

  • Finalized QC protocols

Key Achievements:
8 MOUs signed with potential suppliers
$2.3M projected savings from negotiated deals
✓ Resolved 4 technical specification conflicts

Client Feedback:
"Mr. Tang's deep industry connections and technical knowledge helped us find better partners than we could alone. The factory comparisons were especially valuable." - Dato' Lim, CEO

(Our supplier tour service covers 22 Chinese industrial hubs. Custom programs available for epoxy resin, transformer, and electrical component sourcing.)


客户主要是贸易商,采购的主要产品是铁心,变压器,箔绕机等。

Business Tour Report: Electrical Component Sourcing Tour with Malaysian Trading Clients

Host: Mr. Tang, Senior Procurement Consultant
Clients: Malaysian trading company specializing in electrical components
Duration: 10-day intensive supplier evaluation (April 10-19, 2024)

Product-Focused Itinerary:

  1. Wuhan, Hubei (Core Inspection)

  • Audited 3 grain-oriented silicon steel core manufacturers

  • Verified:
    • B30P095 grade compliance
    • Laser scribing technology adoption
    • 0.23mm/0.27mm thickness options

  1. Shaoxing, Zhejiang (Transformer Hub)

  • Compared 6 dry-type transformer factories

  • Key parameters evaluated:
    • 10kV-35kV class production capacity
    • Partial discharge (<10pC) test results
    • Vacuum pressure impregnation systems

  1. Guangzhou, Guangdong (Foil Winding Machines)

  • Tested 4 models of automatic foil winding equipment:
    • 800mm-2000mm winding width range
    • ±0.05mm tension control accuracy
    • IoT-enabled production monitoring

Commercial Outcomes:
✓ Shortlisted 5 Tier-1 suppliers for each product category
✓ Negotiated 12-18% better FOB prices vs. Malaysian market
✓ Established 3 new quality control checkpoints:

  1. Core loss measurement at 1.7T/50Hz

  2. Transformer temperature rise testing

  3. Winding machine repeatability validation

Technical Highlights:
• Identified supplier with dual-certification (IEC 60076 & IEEE C57.12.01)
• Discovered factory producing 2500kVA transformers with 99.3% efficiency
• Verified availability of 1500mm wide CRGO cores

Client Testimonial:
"Mr. Tang's technical questions uncovered details we'd never think to ask. We're now importing with 30% lower quality risks." - Ms. Aisha, Procurement Manager

 

 

 

 

products
NEWS DETAILS
Business Tour Report: Supplier Visits Across China with Malaysian Clients
2025-07-21
Latest company news about Business Tour Report: Supplier Visits Across China with Malaysian Clients

Business Tour Report: Supplier Visits Across China with Malaysian Clients

Host: Mr. Tang, International Business Director
Clients: 5-member delegation from Malaysia (Transformer Manufacturers)
Duration: 12-day program (March 5-16, 2024)

Itinerary & Technical Focus:

  1. Chunming, Hubei (3 days)

  • Evaluated epoxy resin raw material suppliers

  • Conducted viscosity/purity tests at 3 factories

  • Negotiated 15% bulk purchase discount

  1. Shanghai (2 days)

  • Visited transformer casing manufacturers

  • Compared 5 automated production lines

  • Agreed on new anti-corrosion coating standards

  1. Zhejiang (4 days)

  • Audited insulation component suppliers

  • Witnessed live UL certification testing

  • Selected 2 qualified vendors

  1. Guangdong (3 days)

  • Inspected final assembly facilities

  • Tested 10 sample units under load

  • Finalized QC protocols

Key Achievements:
8 MOUs signed with potential suppliers
$2.3M projected savings from negotiated deals
✓ Resolved 4 technical specification conflicts

Client Feedback:
"Mr. Tang's deep industry connections and technical knowledge helped us find better partners than we could alone. The factory comparisons were especially valuable." - Dato' Lim, CEO

(Our supplier tour service covers 22 Chinese industrial hubs. Custom programs available for epoxy resin, transformer, and electrical component sourcing.)


客户主要是贸易商,采购的主要产品是铁心,变压器,箔绕机等。

Business Tour Report: Electrical Component Sourcing Tour with Malaysian Trading Clients

Host: Mr. Tang, Senior Procurement Consultant
Clients: Malaysian trading company specializing in electrical components
Duration: 10-day intensive supplier evaluation (April 10-19, 2024)

Product-Focused Itinerary:

  1. Wuhan, Hubei (Core Inspection)

  • Audited 3 grain-oriented silicon steel core manufacturers

  • Verified:
    • B30P095 grade compliance
    • Laser scribing technology adoption
    • 0.23mm/0.27mm thickness options

  1. Shaoxing, Zhejiang (Transformer Hub)

  • Compared 6 dry-type transformer factories

  • Key parameters evaluated:
    • 10kV-35kV class production capacity
    • Partial discharge (<10pC) test results
    • Vacuum pressure impregnation systems

  1. Guangzhou, Guangdong (Foil Winding Machines)

  • Tested 4 models of automatic foil winding equipment:
    • 800mm-2000mm winding width range
    • ±0.05mm tension control accuracy
    • IoT-enabled production monitoring

Commercial Outcomes:
✓ Shortlisted 5 Tier-1 suppliers for each product category
✓ Negotiated 12-18% better FOB prices vs. Malaysian market
✓ Established 3 new quality control checkpoints:

  1. Core loss measurement at 1.7T/50Hz

  2. Transformer temperature rise testing

  3. Winding machine repeatability validation

Technical Highlights:
• Identified supplier with dual-certification (IEC 60076 & IEEE C57.12.01)
• Discovered factory producing 2500kVA transformers with 99.3% efficiency
• Verified availability of 1500mm wide CRGO cores

Client Testimonial:
"Mr. Tang's technical questions uncovered details we'd never think to ask. We're now importing with 30% lower quality risks." - Ms. Aisha, Procurement Manager

 

 

 

 

Sitemap |  Privacy Policy | China Good Quality Transformer Winding Machine Supplier. Copyright © 2023-2025 Wuxi Jiachen Power Electronics Equipment Co., Ltd. . All Rights Reserved.